Change assessment
Use before non-trivial planning/implementation and during non-trivial review. Let it shape scope and verification; avoid process theatre.
Rate three dimensions
- Value — concrete user, product, operational, or maintenance benefit; include urgency.
- Risk — regression likelihood/impact: data loss, security, cloud incompatibility, disruption, hard rollback.
- Complexity — concepts, dependencies, layers, states, verification surfaces; not line count.
Use Low, Medium, or High. Give one evidence-based sentence each. No pseudo-precise scores.
## Assessment
- Value: High — <concrete benefit>
- Risk: Medium — <failure modes and reversibility>
- Complexity: Low — <conceptual and verification burden>
- Recommendation: Proceed | Reshape | Defer — <why>
One assessment per overall change.
- High value never excuses unmanaged risk/complexity.
- High risk needs earlier proof, narrower increments, rollback, or stronger checks.
- High complexity needs clearer boundaries and smaller steps, not automatic abstraction.
- Low value plus high risk/complexity suggests reshape or defer.
- Revise after material scope discovery.
Plans: assessment before steps. Reviews: findings first, then assessment. Assessment informs; never replaces user intent or evidence.