# Change assessment
|
|
|
|
Use before non-trivial planning/implementation and during non-trivial review. Let it shape scope and verification; avoid process theatre.
|
|
|
|
## Rate three dimensions
|
|
|
|
- **Value** — concrete user, product, operational, or maintenance benefit; include urgency.
|
|
- **Risk** — regression likelihood/impact: data loss, security, cloud incompatibility, disruption, hard rollback.
|
|
- **Complexity** — concepts, dependencies, layers, states, verification surfaces; not line count.
|
|
|
|
Use `Low`, `Medium`, or `High`. Give one evidence-based sentence each. No pseudo-precise scores.
|
|
|
|
```markdown
|
|
## Assessment
|
|
|
|
- Value: High — <concrete benefit>
|
|
- Risk: Medium — <failure modes and reversibility>
|
|
- Complexity: Low — <conceptual and verification burden>
|
|
- Recommendation: Proceed | Reshape | Defer — <why>
|
|
```
|
|
|
|
One assessment per overall change.
|
|
|
|
- High value never excuses unmanaged risk/complexity.
|
|
- High risk needs earlier proof, narrower increments, rollback, or stronger checks.
|
|
- High complexity needs clearer boundaries and smaller steps, not automatic abstraction.
|
|
- Low value plus high risk/complexity suggests reshape or defer.
|
|
- Revise after material scope discovery.
|
|
|
|
Plans: assessment before steps. Reviews: findings first, then assessment. Assessment informs; never replaces user intent or evidence.
|