Files
ontime/docs/agent-guides/change-assessment.md
T
2026-08-25 21:41:18 +02:00

1.3 KiB

Change assessment

Use before non-trivial planning/implementation and during non-trivial review. Let it shape scope and verification; avoid process theatre.

Rate three dimensions

  • Value — concrete user, product, operational, or maintenance benefit; include urgency.
  • Risk — regression likelihood/impact: data loss, security, cloud incompatibility, disruption, hard rollback.
  • Complexity — concepts, dependencies, layers, states, verification surfaces; not line count.

Use Low, Medium, or High. Give one evidence-based sentence each. No pseudo-precise scores.

## Assessment

- Value: High — <concrete benefit>
- Risk: Medium — <failure modes and reversibility>
- Complexity: Low — <conceptual and verification burden>
- Recommendation: Proceed | Reshape | Defer — <why>

One assessment per overall change.

  • High value never excuses unmanaged risk/complexity.
  • High risk needs earlier proof, narrower increments, rollback, or stronger checks.
  • High complexity needs clearer boundaries and smaller steps, not automatic abstraction.
  • Low value plus high risk/complexity suggests reshape or defer.
  • Revise after material scope discovery.

Plans: assessment before steps. Reviews: findings first, then assessment. Assessment informs; never replaces user intent or evidence.