Commit Graph

14 Commits

Author SHA1 Message Date
Alex Christoffer Rasmussen 2a890cf2b3 fix: issue where a countToEnd would lead to incorrect expected times (#2149)
* fix: issue where a count-to-end would lead to incorrect expected times

* fix: include add time in overtime when countToEnd

* fix: ui and server use same calculation for expected end
2026-07-25 11:22:24 +02:00
Claude 4addb50ca4 feat(countdown): allow counting down to a group 2026-07-13 17:29:56 +02:00
Carlos Valente 1849b4d39f Deps migration (#1988)
* chore: migrate eslint to oxlint

* chore: migrate prettier to oxfmt

* chore: migrate typescript

* chore: toThrow should have a expected value

* chore: cast test value as Day

* chore: small title fix

* chore: mocks should be hoisted

* chore: incorrect async useage

* chore: test should be inside description

* chore: test sohuld include an expeced

* chore: oxfmt

---------

Co-authored-by: alex-Arc <omnivox@LAPTOP-RC5SNBVV.localdomain>
2026-03-08 16:22:12 +01:00
Carlos Valente 8e32314667 refactor: improve performance in rundown
- leverage compiler
- correct subscriptions from zustand
2026-02-08 11:20:09 +01:00
Alex Christoffer Rasmussen 026e24bf84 Feat: unify view search params (#1947)
* feat: main src in backstage view

* feat: main src in timeline view

* feat: main src in countdown view

* feat: main src in studio view

* feat: hide past events in countdown view

* notes can not be set as main src

* feat: show group title as secondary src

* chore: spelling

Co-authored-by: Carlos Valente <34649812+cpvalente@users.noreply.github.com>

---------

Co-authored-by: Carlos Valente <34649812+cpvalente@users.noreply.github.com>
2026-01-27 20:42:07 +01:00
Carlos Valente 08b8e73393 refactor: finish view directory migration 2025-12-21 13:32:12 +01:00
Alex Christoffer Rasmussen c4e6215b29 Update test time until (#1809)
* test views

test timeline

* timeline show seconds when less than 2m

* fix: countown typings

* refactor: backstage schedule item

* chore: lint
2025-10-07 12:32:12 +02:00
Carlos Valente 0035070db8 refactor: improve automated following 2025-09-21 07:42:47 +02:00
Alex Christoffer Rasmussen 67e67d6a5d feat: propper timeuntil calc in countdown view (#1765)
* fix error with is linked to loaded metadata

* pass down metadata

* create expected schedule

* expected start in sub info

* for singel subscribtions

* refactor

* add color to single events

* refactor: clean up subscribtion data

* show schedule and secondray data for single events

* improve subscribtion data display
2025-09-07 21:49:45 +02:00
Carlos Valente f23adfa45c refactor: extract countdown data to hook 2025-08-18 06:16:53 +02:00
Carlos Valente dddeefd544 chore: rename projected > expected 2025-08-06 21:40:19 +02:00
Carlos Valente ad2ef3b53f refactor: small fixes and style tweaks
fix: prevent reflow on editing images

fix: schedule overview

fix: report on all events

refactor: over-under time colours

fix: prevent edit on delete
2025-07-14 16:08:40 +02:00
Carlos Valente fdd81354cc refactor: migrate params editor drawer to custom component 2025-06-21 13:35:47 +02:00
Carlos Valente b2b115c329 refactor: countdown view redesign
- allow selecting multiple events
- follow selected
- remove past events
2025-06-20 16:27:36 +02:00